Features Overview

The following is placeholder text known as “lorem ipsum,” which is scrambled Latin used by designers to mimic real copy. Suspendisse nec congue purus. Fusce at massa nec sapien auctor gravida in in tellus. Vivamus a ante congue, porta nunc nec, hendrerit turpis. Donec eget risus diam.


Kaiser 4th Floor Remodel.png

Kaiser Permanente

4th Floor Oncology & Pharmacy Lab Remodel:

 

PDE provided the electrical system installation; including LED lighting fixtures with a Title 24 lighting control system, power outlets both on normal power and emergency power circuitry, power connection to the new roof-mounted AHU, boiler, pumps and exhaust fans.  PDE provided and installed the fire alarm and security systems per code requirements.  Project successfully completed, working off-hours third shift schedule.

 
Northrup Property and Building.png

North Grumman

Building D-1 Dry Laser Lab Build Outs – Phase 1

PDE scope of work included demolition and safe off of lights, outlets, panels, disconnects and equipment.  Re-feeding of electrical equipment from panels demoed during scheduled shutdown and re-energization of 13 distribution panels.  No interruption in power and zero impact to the 24/7, 365 critical process taking place at the laboratory.  Northrop Grumman presented PDE with certificate of recognition for the work performed.