Laboratory | Health Care

Our laser-focused management team, coupled with highly-skilled IBEW veteran electricians makes PDE a natural choice for the region’s highly-rated educational institutions and health care providers.  Our project experience spans from LED lighting retrofits to major MEP systems integration/installations.


Kaiser Permanente

4th Floor Oncology & Pharmacy Lab Remodel:

 

PDE provided the electrical system installation; including LED lighting fixtures with a Title 24 lighting control system, power outlets both on normal power and emergency power circuitry, power connection to the new roof-mounted AHU, boiler, pumps and exhaust fans.  PDE provided and installed the fire alarm and security systems per code requirements.  Project successfully completed, working off-hours third shift schedule.


Lawrence Berkeley National Laboratory

PDE has been performing electrical contracting services at LBNL for over 15 years.  PDE was the electrical contractor for a 42,000 ft² 3-story General Purpose Laboratory at the Lawrence Berkeley National Laboratory.  This $50M project includes a separate Central Utility Plant, new medium-voltage switching and distribution, substation and generator.  To address the highly complex and interconnected systems of a state-of-the-art laboratory, the project members have utilized Building Information Modeling (BIM) technology to ensure and coordinate an efficient installation.